Thats a shame to hear! I hope you find a nice place soon. I'm grateful everyday for having a permanent workplace at my parents house.

There are no secrets, one just has to ask the right questions.

 

 

Posted

Thanks all! It's been quite a hectic few days and everything is changing so quickly it's hard to stop and think for a bit. I have a loose plan on what to do with everything in the meantime but I'm guessing it's 4-6 months absolutely best case before I get reestablished. There's all sorts of talk amongst the other people at the shop about moving to a new place locally but I don't have the bandwidth to move, set up a new shop, and only to move again. I think having my entire shop in storage will be a constant reminder to make efforts to a long term move with my own space. Little things to keep me sane at this point...

  • Like 2

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

Posted

You forgot to say 

"To be continued"

  • Like 1

“So I'm lightin' out for the territory, ahead of the scared and the weak and the mean spirited, because Aunt Sally is fixin’ to adopt me and civilize me, and I can't stand it. I've been there before.”

The only bad experience is the one from which you learn nothing.  

 

Josh

http://www.dosgatosdesignsllc.com/#!

https://www.youtube.com/channel/UCdJMFMqnbLYqv965xd64vYg

J.States Bladesmith | Facebook

https://www.facebook.com/dos.gatos.71

https://www.etsy.com/shop/JStatesBladesmith

Posted

Continued, indeed! The way I'm looking at it is, especially for this project, the work isn't actually done until the container is packed, locked, and sitting somewhere in a field waiting for its next voyage. There are a few things I want to get done before then, and with a fairly substantial amount done already I figure I can at least get through the backlog of photos that will bring those two timelines together.

 

treadle pivot.jpg

 

One of the machines first on the list to go was the vertical mill. Even before the news of the entire shop closure it was sold and primed to be shipped out so this became the next most pressing bit of work. I have a bridgeport but not currently in a place that's useable and with the other half of the machining to do the table does not lower far enough for what I needed. This, however, was a low hanging fruit and with the timeline I decided to save the originals and not remake them entirely. For some reason the two treadle pivot bolts/standoffs are different. Whether that means they are already replacements or it was made that way, hard to tell. Since there is no method of screwing them into the lower frame there are several old gashes cut into them by way of pipe wrench. Taking them out added to the collection and before it began to turn I was not certain they were even threaded in. But luckily the rust broke free without issue and the remaining threads were good enough to hold in a collet block.

 

pivot flats.jpg

 

On both pieces I milled a set of 4 flats for a wrench to get into so it's easier for installation and whoever takes it apart next.  They didn't need to be anything special and it helped clean up the roughness.

 

treadle pivots.jpg

 

I probably took a picture of which one is which, but the two are obviously different. The bolt that goes into the left side of the top standoff is in poor shape and needs replacing and also a different size from the bottom left stud.

 

base lower bottom primer.jpg

 

After the first round of primer on the frame bottom dried thoroughly I switched around the shoring and finished off the bottom. My plan was to also paint this and while I technically still can, I think that ship has sailed.

 

base lower primer.jpg

 

Another couple of days for the latest under primer to cure and it was back to the bulk of the frame. I had already needle descaled all the rust off but I had to go over the surface again with wire wheel. I specifically saved this for the last possible moment before priming because of how much dust flows back here from the dust collector on one side and the trash bins on the other. It looks a bit spotty in the above picture but I went over it a second time to really get into all the casting flaws on the left side.

 

frame lower painted 1.jpg
 

frame lower painted 2.jpg

 

frame lower painted 3.jpg

After that, it was on to painting! At this point I hit what felt like the high point in the project. A lot hinged on this getting done and once the paint was on and dry without too much dust intrusion, it really looked great. There may be a few touch ups later once I run the bore hone through the pivots and a drill mounted spindle sander through the anchor points. The idea was to clean out the bearing surfaces again post painting to remove any that might have dripped in. Swirling around the paint brush in the mount holes didn't work as well as I would have liked and before I go back in there with more paint to seal it up I need to remove a little bit more of the surface corrosion that the bottle brush could not remove. Unfortunately I did not discover the right sanding apparatus until after I committed to painting. On the parts what received the first round of paint I debated doing a second coat but was unsure if I had enough to go around. There still might be, but I do not think it needs it considering none of this will be living outside again a week or two from now.

 

 

  • Like 1

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

  • 1 month later...
Posted (edited)

With the shop doors closed and everything loaded into a 20 foot shipping container, I have a chance to go through a lot of what I managed to finish on this before the extreme panic ensued. I hoped to get to this sooner while it was all still fresh but here we are...

 

The final bit of machining while I still had access to the big mill was to clean up the sow block. It was so large that it wouldn't fit under my bridgeport and heavy enough that I needed the overhead gantry to lift it onto the table. Fortunately the pickup tongs worked a treat manoeuvring it into place! For how haphazard they were to make in the moment they've become invaluable.

 

gantry lift.jpg

 

Fortunately the lower dovetail in the sow block was exactly small enough to fit in the vice and hold it in place. Unfortunately, the thing was so big that I had about 1/8" clearance on the table travel once the vice position was accounted for. Also time consuming was tramming the block into place. There were so many pits and grooves from use that there was hardly anywhere to take a reading off of so in the end I got it as close as I could and went for it. Since the die also needed cleaning it wasn't that big of a deal since both faces would be modified.

 

sow block index.jpg

 

First I resurfaced the bottom to eliminate as much of the craterous void in the middle as I could. I'm not entirely sure how it formed or if it was a casting defect that never got cleaned but I wanted to remove as much as I could without radically changing the final die height.

 

sow block dovetail surfacing.jpg

 

This is what I was left with when I called it and went onto the sides. Because the slot is tapered for the keyway and the die has parallel sides, it meant moving the vice multiple times as I worked various features.  Notice the little shoulder on the top of the block. That was worn in from the die shoulders cutting into the sow block through its hundred odd years of use, which meant I had a perfect guide for where to machine down to compensate for the lowered floor of the slot. I considered resurfacing the whole top face of the block due to a great deal of shoddy reprofiling on one side to allow a lower angle of the workpiece, but it seemed a detriment to the overall character. I might come back with files to make it more aesthetic but it's a low priority.

 

lower die surfacing.jpg

 

After the sow block was done I put the die in and got to work. It's a little hard to see from the picture but the bottom has a weirdly intense amount of crown to it with the corners pulling down. Whatever caused it, I took enough out to have the majority flat again and took the bur off the corners of the dovetail, finishing with a small chamfer. Overall it was in better shape than I thought so it was just small spring passes to take out any problem areas.

 

lower die machined.jpg

 

The final fit is solid but will require a bit of fine tuning when I can get back to it.

 

Now that I know the fit and how much it opened up, I was able to remake the bottom die key. When I received it, there was a shim between the key and die, somewhere around 3/64 or so. The plan was to use the key from this to replace the one for the top die/ram joint that got destroyed to get them apart. However using the original key I checked and the taper angle is still good so I used it as a reference in forging the new one.

 

Bottom Die key stock.jpg

 

For stock I used a bit of 4140 bar. Way oversized for what I need but the only thing large enough to get the job done.

 

Bottom Die Key forging.jpg

 

Checking as I went, the angle gradually took shape, ultimately being fatter than needed so I had room to resurface without thinning down the small end.

 

Bottom Die Key angle.jpg

 

Shimming the chuck of the surface grinder to match the original angle was fairly simple and made the whole job easier. I made a die for a little giant without an original to reference and it was done on the mill instead, which was a lot more fiddling.

 

Bottom Die Key grind.jpg

 

From there it was cleaning up both sides and into the hammer to check. One of the benefits of using a magnetic chuck is I can take it off and on as often as I want without needing to check for precision in alignment.

 

Unfortunately I do not have any pictures of it in place because it was at this time that everything started getting thrown into the shipping container.

 

 

edit-

I forgot about this last picture. Cleaning up the bottom half of the frame I uncovered this hole that is seemingly for a die retention post so the sow block cannot slide out during use. Curiously enough the bottom of the sow block does not have any such features or indications of having had a pin that sheared off. Who knows what it might be for! Part of me expected to find something like this in the dies, but also no such evidence.

 

frame lower key receiver.jpg

Edited by John Page
  • Like 1

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

Posted

Another cost deferring operation was to remake some pieces for what had at one point been a repair. The bell cushions on the drive end of the helve had seen some damage and a previous owner did a great job repairing where the casting cracked off the flange. The base where the bolts attach it to the helve yoke frame piece cracked, a new flange plate cut, both pieces threaded, and the cast iron joined back to the steel bolt plate. However, there was another added plate that went on the top of the bell so none of the working load was taken by the cast iron threads. This piece, while serviceable, was torch cut and ugly, slightly misaligned, and only on one side. Because it is a concern to a real problem, I wanted to add a second one to the other side that had not yet broken. In the process of making a new one I just did both so they matched and were a little more respectable. It was a challenge to get right because there wasn't any good reference for any of the hole positions. Tracing the original bell housing joint gave me the size and bolt patterns, but not the projection where the centre hole needed to be which both goes over the raised top of the housing and allows a tensioning bolt to pass through and apply tension to the internal rubber cushions.

 

helve plate cad.jpg

 

Had the waterjet been removed or out of service or I got to it too late, my plan was to have them lasercut. That, including material, would have been about $97 each and arguably not worth the cost. However one of the great things about the old shop that I will sorely miss (and a contributing factor to how insanely heavy the container ended up being) was how much scrap material was readily available.

 

waterjet helve plates.jpg

 

I was able to get both parts out of this bit of 5/8" plate. Depending on how everything comes together when it's time for assembly, I may need to open the central hole/reposition it by way of a boring bar on the mill but initial tests suggest it will be good enough as it is.

 

Helve bell plates.jpg

 

Before priming and painting, I took a chamfering tool to all the edges to soften them and clean the sharp corner left by the waterjet.

  • Like 1

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

Posted

I may have more pictures on my camera still but this is the last of what I have edited. Due to the cataclysmic weight:footprint area of the hammer frame, the difficulty in moving it, and the challenge of keeping it from moving during transit, the final urgent priority to finish before the shop closed was to get a baseplate figured out. The plan was ultimately to make something sturdy, cushioned, and able to lift the hammer without being able to get underneath it.

 

Baseplate rubber.jpg

 

For the cushioning, I got two horse stall mats. One ended up being thinner than the other somehow but I think that will be better in the long term. The thick one goes between the floor and the plate, the thinner between plate and hammer. Not sure if I mentioned it before, but the lower frame is extraordinarily uneven. At some point in the future I might try to flip it over and set it up under a travelling head shaper to surface but it's so heavy and awkward that I doubt that will happen. However it is a good 1/2" or more with a step down the centre where the casting form shifted or was not aligned properly. The idea of having the smaller mat directly under the hammer is to have it level out as much as possible to half the frame is not floating.

 

Baseplate stock.jpg

 

For the base itself, I scored this 1/2" plate. Cutting it with an angle grinder was not the best time but only took about an hour and came out clean enough to not have to do anything else and it was a single cut to get to size. The offcut sitting on top became a brace for either end.

 

Baseplate layout.jpg

 

The general plan is to wrap 3 sides with 1/2x2" flat bar for rigidity and to act as an apron to keep the bottom mat contained.

 

Baseplate rim.jpg

 

Queue a mind numbing amount of welding.

 

Baseplate bottom.jpg

 

Working in ~6" increments I welded the entire seam on one side and maybe half of the other. On the open end of the apron I added this wide bit of extra plate for a few reasons. On each corner I drilled and tapped 7/8" holes to accept lifting eye bolts and having extra material means they can have more thread engagement and thereby lift more weight. Each bolt is rated for 5500lbs, so between the 4 of them the entire hammer can be safely lifted by the baseplate. Also on the open end of the apron, I wanted nothing to interfere with the treadle during operation. By having the apron enclose the front end of the baseplate, it would be one extra thing to have to manoeuvre around. This way there is a solid inch of steel here to prevent the plate from buckling as it lifts, unlikely as that is.

 

Baseplate toejack points.jpg

 

On both ends I left space for a toe jack. On the front this means that the stiffening plate sits a little in from the edge and has a little gap in the weld for extra clearance. On the back I notched out a small section but in hindsight it needs to be about twice as wide because the way toe jacks work is having the base of the jack on either side of the toe so it doesn't tip over under load. If I find it needed I'll go back and cut it wider but with various other methods of lifting the first bit off the ground I doubt it will become a problem.

 

Baseplate corners.jpg

 

From the glorious scrap pile I cut these two monstrous corner brackets. The bottom hole was already there and unneeded, but the top two on each are for rigging/mounting. Depending on how the new theoretical shop ends up, I may put in a lineshaft to power all the belt drive machines. But until then I need a way to mount the motor in relation to the hammer so these are for that eventuality. I figure having some combination of orientations to bolt into, to add shackles to for rigging, or to put a bar through to jack against is worth the trouble.

 

Baseplate corner anchors.jpg

 

This is the top back corner of the base, corner bracket sitting in place. That extra pad is for extra thickness for the eye bolts in addition to the full length strap underneath. Total the thickness there is a little over 1.5". I planned to add these to the front too but decided not to to keep it clean in spite of the majority of the weight being on the forward end. That extra hole on the bottom edge of the corner bracket got plug welded as well as all the seams top and bottom. By this point I was extremely glad I added these because the thing weighs around 400lbs and moving it alone was challenging even with the gantry.

 

Baseplate primed.jpg

 

Covered on the underside with the last bit of industrial primer, it was almost time to add the rubber and deal with the final challenge of this phase.

 

Baseplate rubber bottom.jpg

 

This is where the pictures end unfortunately, but the beginning of the complicated effort of getting the footprint of the hammer transferred to the plate without actually putting it on first. In hindsight I should have transferred the hole pattern before adding the rubber with contact cement.

 

To mark the footprint of the machine, I jacked up one end of the frame, slid a roll of paper under it, lowered it back down, lifted the other end, pulled the sheet through, lowered it again, and traced it. At this stage it was still up on a pile of 4x4s from priming and painting so the template was difficult to mark accurately with the majority of it suspended over open space. Also during this process I severely regret not marking which side was up in relation to how the hammer sat as well as which end was the front. (foreshadowing)

 

With the paper painstakingly removed and trimmed to size, I transferred it both to the baseplate and the second rubber mat. I debated for a while about how best to deal with all the scale coming off the dies and collecting under things during use. In a perfect world it would not be an issue, but the little raised circles on the mat are a perfect valley to trap falling scale. In the end I put the smooth side down, circles up, and cut it very slightly undersized so the frame would act as a sort of drip edge to falling scale and hopefully prevent it from accumulating.

 

To drill the holes I used a mag drill from the top. Yet herein lies one of the design challenges. To bolt the hammer tightly to the frame, the bolts need to not spin as the nuts tighten down. I suppose I could have threaded the holes but due to the timing and dire need to have this ready as soon as possible, it was not viable to lift the hammer on, trace the holes, lift it back off to drill and tap, then place it back down for good. The solution I ended up with (TBD if it actually works) is to use key locking plough bolts. Having never heard of these before, it took a while to find them. There are to varieties of these. One is like a countersunk bolt combined with the square shoulder of a carriage bolt, the other a little weirder. It has the same countersunk head profile so it sits flat (important because the base plate needs to sit flat on the ground) but instead of the square shoulder it has a single flange like a key for a shaft or arbour. In theory this is matched to a slot cut into a countersunk hole with a cape chisel or something, or more ideally just sort of grabs under the tension of the whole thing as it locks down against a nut and bolt. To cut the countersinks I had to flip the thing back over and open the hole in the rubber mat with an annular cutter, then follow it up with a very large and equally expensive countersink. Had the rubber not been there I would not have been fighting 3/4" of rubber and the inability to use the mag drill easily. Now that this is all behind me I regret not trying something else and also using bolts far longer than I thought I would need.

 

Hammer loaded.jpg

 

Getting the baseplate and both halves of the frame in the right spot was difficult and none of it went according to plan. In spite of being as close to the container doors as possible there is still a substantial distance to get inside that the length of a 4' fork does not achieve. Fortunately I was able to commandeer heavier equipment during the evacuation process and managed to use a telehandler to lift the frame pieces into place with. To the discerning eye you might notice a few things about how it's in there. First it is ratchet strapped down via the eye bolts. For a handful of reasons the plough bolts did not end up working although they are in there and it did sort of fit. However lowering the frame down one end at a time so it was easier to align without having hands in there meant that all four of them got pushed down past the level of the top of the bolt holes and very likely punched through the plywood floor of the container. Also it is in backwards. Or more specifically it is on the plate backwards. Somehow I managed to get the template (that rolled up red paper sitting in the middle of the frame passthrough) flipped around so the back of the hammer is on the front of the plate. For now that is annoying but not the end of the world because now I can use the more reinforced end to take the bulk of the weight. Also the rubber mat under the hammer/on top of the plate shifted as the hammer went down so the original plan to have it inset from the hammer footprint would not have happened with how close I cut it. Additionally it did not yield to support the weight evenly across the casting defect so it might be back to the drawing board entirely with something more pliable.

 

Lifting the top half of the frame into place was thankfully very easy because the two mating surfaces are flat. I may put a thing layer of cork or rubberized cork in there for the final assembly but it might be unnecessary with how well it sits. The less exciting part is the bolts I got do not fit. The holes somehow do not actually align. One side is perfect, but then the other side is offset by a good 3/8" and no chance of getting the tight fitting bolts to clear. It sort of explains why the bolts in there when I got it were strangely undersized and clearly not meant for use. Even if I go down a size I suspect they will still not fit and require some sort of reaming to make work. Getting a drill down there with the two halves in place is going to be a nightmare but using bolts 3 or 4 sizes down does not seem right.

 

That last picture was about 2 days before the container got picked up and subsequently filled with all sorts of other heavy nonsense to fill in the gaps. In the end it weighed 38,260lbs and was its whole own ordeal to make transportation happen. Until I find a place, hopefully late spring, it is off somewhere inaccessable and waiting for the next great struggle of somehow unloading it by myself.

 

I have a few more things to hopefully find answers on while I look for a new shop so if all goes well there may be another quick update or two before the unpacking begins.

 

Cheers!

 

John

  • Like 2

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

  • 5 months later...
Posted

The saga continues! After a tremendous amount of waiting, planning, expense, and worrying over logistics, the container has finally made it to its new home! I'll need to build a proper shop before too long but for the time being I have a 26x16 semi-detached garage that will be my new workshop for the foreseeable future. The challenge was the property is up a winding, inclined gravel driveway with trees above and beside without much room to manoeuvre. The container, weighing 38,000lbs, had obvious transport limitations. The monster of a truck that delivered it from Portland weighed another 40,000lbs and was long enough that, had it been any longer, would not have made it. Apparently the slewing arms were capable of lifting 80k! Truly an incredible piece of machinery. The driver was fantastic and managed to get up the driveway, turn into the drop spot, back out and 3 point turn to head downhill the right way without hitting anything, losing traction, or running off the shoulder. I was thoroughly prepared for the worst and fully expected it not to work at all given how many issues I had getting it out of San Diego. But fortunately, this time it went without a hitch! 

 

Well, almost. The original plan was to back into the drop spot, so the doors were on the cab end. That ended up not being the case, which left the doors opening to the far side. There is enough clearance to get a forklift around after a slight bit of grading, and being the only complication, I'll gladly take it! My new neighbor is wonderful and was a huge help in getting everything ready and safe. He's had a wild life and worked more careers than most people I've met, somehow the perfect storm of dealing with this sort of thing. 

 

Opening the doors for the first time I was expecting at least some level of chaos from the 1500 mile voyage and failed attempt at going up a tilt bed truck. However, everything was in its proper place and the straps were all still somehow tight after baking in the sun for half a year. Next challenge is getting something to unload it, as the hammer frame sits in the very front of the container, preventing most everything else from getting out. That is, however, far less concerning than the rest of the ordeal and now that there's something to do again I feel like I have regained some sense of purpose!

 

PhotoData_IMG_4921.jpg

 

PhotoData_IMG_4922.jpg

  • Like 1

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

Posted

Happy landings!  Glad you got it touched down.

 

I had a real head-shake moment when I read your last post.  For some reason, all this time, I thought you were in the UK :blink:

-Brian

Posted
4 hours ago, Brian Dougherty said:

Happy landings!  Glad you got it touched down.

 

I had a real head-shake moment when I read your last post.  For some reason, all this time, I thought you were in the UK :blink:

 

Thanks! Really good to be on the other side of it! Alas I'm on the other side of the pond, but I do really envy the industrial history over there! Getting machine tools out here is tough compared to the East Coast, and even that pales in comparison to the old British ironworks. Part of the long term plan is to set up a lineshaft to run some of the machinery but it's a real problem to find parts. But I suppose the thrill of the hunt is half of the journey!

  • Like 1

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

Posted

Those old shops running everything off of lineshafts were something! There is a youtuber that I catch every now and then that has a pretty functional machine shop where everything runs off a horizontal steam engine.  I think he needs the shop just to keep everything in running condition.

 

I like old machines, but everything I have is new enough that it came with it's own motor :)

 

-Brian

Posted

That really would be something! I have a friend in LA who has a lineshaft shop who I've learned quite a bit about the workings from and he is in the process of restoring a horizontal steam engine as well! Around 15hp if I remember right, perfect for what he's got going on. I have a very vague long term plan of trying to get a shop running that way for the purposes of education and restoration of old machines. It seems that technology, although long outdated now, is really on the cusp of extinction outside museum displays. A few shops here and there for the novelty but it's so difficult to find parts at reasonable prices that doing it from scratch is monumental. Aside from the power hammer, I have a belt driven (with its own motor in the housing) surface grinder, post drill, and rolling mill I can drive off a shaft plus some other executable-without-too-much-trouble ideas in the background. Getting a shaper is high on the list and I have one I know about I can get for the cost of hauling it but given how rough the last round of extraction was I'm not too keen to jump on it just yet. Maybe I shouldn't get ahead of myself and just get this hammer running first!

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

Posted

Just subscribed thanks! I've also been following Iron Jonsey for a while and he's awesome. Helped me out a little when I was trying to figure out how to fabricate the flat belt drive wheel for the axle with the eccentric cam drive in the event I can't find a replacement somewhere.

  • Thanks 1

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

Posted (edited)

If you are in the Portland, OR area, you might enjoy a trip to the Bull Run Powerhouse that was decommissioned in 2008.  They have a functional belt powered machine shop that was barely used.  It was built in the 1900s (began operating in 1912), and by that time, it was just becoming possible to order parts and have them delivered faster than machining them onsite.

The caretaker, Kellen, also has his shop on site and he's been a professional blacksmith for at least 20 years. About 2-3 years ago, the rehabbed the belts and machines and got it functioning again.

Edited by billyO
  • Like 2
One should keep in mind,
we are all both the blacksmith
and iron in the fire...

 

as always

peace and love

billyO

 

 

Posted

Way cool thanks for sharing! I'm closer to the coast but drive through there often enough to make it worth the trip! That kind of shop is an incredible window into time and the knowledge of the caretakers is invaluable. It'd be great to get a good chat in and some nuggets of wisdom!

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

Posted

I'll also suggest joining the NWBA (I have no financial interest in that organization, just a member who recognizes the value).  A longtime member from central WA, Torvald Sorenson is the guy who did most of the rehab/cleaning of the machine shop and is the go-to person in the NWBA AFAIK.  

You also might be interested in the Great Oregon Steam-Up the last weekend in July/1st weekend in Aug.  This might be a resource for hard-to-find parts.

The Great Oregon Steam-Up — Powerland Heritage Park

  • Like 1
One should keep in mind,
we are all both the blacksmith
and iron in the fire...

 

as always

peace and love

billyO

 

 

Posted

Once again thanks for the great info! I've been part of the ABANA and CBA circuit for a while but plan on going to the October NWBA event this year. I also hear they have a great weekend out in Government Camp. The steam event is just about perfect timing too, it's right after I finish moving the last bit of equipment up from California. I really didn't expect there to be such a great swath of history and fellow smiths in the area!

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

Posted
On 7/14/2025 at 10:04 AM, John Page said:

I also hear they have a great weekend out in Government Camp.

Ahh, you're talking about Blacksmith Week (I hear Mark Aspery is demoing this year).  That's not part of the NWBA, but run by CCAC (Cascadia Center of Arts and Crafts).  I'll probably see you there, too. 

Stay cool this week, and welcome to OR.

  • Like 1
One should keep in mind,
we are all both the blacksmith
and iron in the fire...

 

as always

peace and love

billyO

 

 

  • 8 months later...
Posted

:o We're Back!!

 

After staring at the problem for the last several months and instigated by a trip to my friend Max's lineshaft shop in LA, I finally committed to moving the hammer frame out of the container. I had a few days of nice weather that dried out the ground a bit so I went for it with hopefully the final bit of heinous rigging improvisation. Fortunately with the bigger lower frame my incredible neighbour came by and helped drag it to the shop. 

 

IMG_7961.JPG

 

Although awkward, the upper frame was the easy bit. I could use the lower frame as a platform to drag the top half over so it wouldn't swing from being pulled forward. The overbuilt frame I made to bottle jack the sow block key out happened to be mostly the perfect height to align with the lower frame. 

 

IMG_7968.JPG

 

Leftover scraps of OSB turned out to be the worst possible surface to roll the pallet jack over while still technically working. The wheels are such a small diameter that the kept catching each edge and dragging the sheet instead of rolling over it, causing the pallet jack to dive into the gravel. Eventually, I made it down the small hill and onto terra firma. 

 

IMG_7971.JPG

 

The bigger lower frame was not as easy. Using various pipe segments and bar stock I was able to lift the front edge to get it mobile, then rig to the back end and pull/slide it out the door. Getting over the threshold and out of the container inspired a bit of false confidence. From that point, it took almost 5 hours to get it another hundred feet or so with two changes in direction, going town a small hill, and over the lip of the concrete pad. Without the second set of hands, it would still be out in the yard. Even still, we only just barely managed to get it moved. At the end of the day I felt like I had gone through one of those full-body workout marathons that leaves you crawling on the floor. Between leavening it around, pushing, pulling, and otherwise Symphysis worthy struggles, just getting it under the roof felt like the accomplishment of the year. Before just committing to it, I had been thinking of all kinds of ways to rig a spare car axle or the like to get it to the point where I could winch it around. Would have been easier...

 

IMG_7975.JPG

 

Unfortunately the move was a 2 day affair. Although in the garage, it was not in position (the easier problem) and one glaring issue that needed to be resolved. Because the first time I lowered the frame onto the baseplate was when it went into the container for its voyage, the bolt hole layout being mirrored never ended up being fixed. So without the forklift access of yore, I had to lift the frame off the plate, slide the plate out, redrill, flip, countersink, and key the holes before rotating it 180 and sliding it back under all in quarters so tight about 2000lbs of stuff has to move every time I change positions. To the right of the above, the I beam is supported by the industrious flypress table and on the left, a stack of assorted nonsense balanced just so. Of course, the chain hoist never has enough reach to actually fully pick up anything so the tower of ballast kept growing on that pedestal. On the far end I was able to run a bar through some holes in the frame and jack it up. Those too, of course, needed to be lifted higher and higher until the hydraulics were able to take the load. 

 

IMG_7982.JPG

 

Somehow, the plate was able to roll out from under the hammer on only the 4th try. But of course, that alone is too heavy to flip so I had to lower the hammer then winch off it to flip the plate upright for access to the underside. 

 

IMG_7983.JPG

 

The rubber mat between hammer and plate had the right position of the holes, just needed to be rotated so drilling down from the top was easy with the mag drill. On the underside, however, the second layer of matting meant I had to get creative. Originally I tried countersinking by hand but it was immediately obvious that it would not work so I ended up clamping this plate to the base as a magnetic surface to work off of. Not the best, but serviceable none the less.

 

IMG_7984.JPG

 

The weird bolts I came up with are keyed (or locking?) plough head bolts. They are essentially a large countersunk head with a single tooth key on them that locks into whatever it passes through so it can be tightened without access to the bolt head. Yes, carriage bolts are probably the more sensible option, but broaching 4 squares in that large of a hole would take several hours with a file. Instead, I could come in with a cape chisel and cut the keyway. In all, it was shockingly effective. It would have been much easier with the plate lying flat, but there wasn't room for that.

 

IMG_7986.JPG

 

All four done and tested, and I could set the plate back down and rotate it around, then slide it back into place. This time, I did have to open the garage door to the convenient torrential rain because the corner of the plate wouldn't clear the rotation by about 3 inches...

 

IMG_7993.JPG

 

The final bit of terror inducing rigging malpractice was to lift the upper frame back onto the lower. While the beam through the centre of the garage is only somewhat structural, it certainly couldn't handle an extra thousand or so pounds at off angles. So, I used the trusty pallet jack and a collection of beams and boards to support the extra load. I tried to convince myself that it is like those construction jacks or the ones in basements that have a screw foot to support the load of long spanning upper floors.

 

IMG_7997.JPG

 

Once the upper frame was high enough (only needing two reconfigurations because the hoist never reaches high enough) I had to winch off of the rolling mill to pull it into position. The whole thing is quite a dance of tensioning and releasing various straps and chains that would be easier with more people but also the sort of thing I would never do except alone because of how insane it is and the introduction of any extra chaos is a sure harbinger of total disaster.

 

IMG_7999.JPG

 

Two full days of struggling and the hammer is finally out of the container, in the shop, and in position. In preparation for the reassembly, I had to push everything in the back side of the shop against the walls so it's a total nightmare back there. 

 

Eccentric Shaft Hone.jpg

 

Which immediately came back to haunt me. The table saw ended up right in front of the little lathe and all the various parts of the hammer in front of the table saw. The first thing I started with was the eccentric shaft and, what a surprise, immediately ran into issues. Maybe I don't remember how hard it was to get apart, but it did not want to go back together. Whether burrs or galling from the disassembly or something else, I could not even get the first part of the eccentric cam back on. So it went between centres (the drive centre received by the through hole of the 3 jaw chuck) and the tailstock hanging half off the bed. A combination of filing and sand paper got it smooth and with a bit of persuasion, able to receive the cam pieces. 

 

Eccentric cam.jpg

 

Another exciting problem with the beginning of reassembly after a year and a half, the small details I would have remembered are nowhere to be found. The very first set of bolts I tried to find were nowhere amidst the piles of sorted and labelled bits, and only to have to go back and look at pictures to verify my sanity is not fully gone. They did not exist in the configuration I got the hammer, instead being these two long studs with a pair of nuts as a head. So right off the bat I need to make or find four big bolts for the eccentric shaft bushings (only the lower bushing in place in the above picture). And, with those plates they have sets of marks on them to indicate pairs and which side of the hammer they should sit on. The only problem is, there are three sets of marks on each set so they effectively mean nothing. I had to try all four combinations of rotation and swapping before I got them to fit inline with the bolt holes in the frame. 

 

Hardware.jpg

 

Back at the pile of hardware and cryptic notes on what they all go to, the only one without a description is the leftmost cardboard box with some brass bushings and various shaft collars. Based on the scoring and corrosion patterns on the eccentric shaft, some of that box definitely goes with it so I'll have to dive back into the picture archive and see what I can find. Also the flywheel end of the shaft has some suspiciously shiny steel so something went on there too. Maybe the brass with the keyway? We shall see.

 

Ram and Guides.jpg

 

Last bit for now, the next available low hanging fruit was to get the sow block, dies, ram and ram guides installed. One of the studs for the ram guide needed a bit of filing to get the threads to engage without cross threading the holes, and once all eight were in place and the ram guides on, I realized that there was probably some sort of order to the original placement because three of them do not seat quite as far as the rest so a bit of unthreaded shoulder sticks out the front. Meaning, I need to find some washers so the nuts can fully tighten. Bronze would look nice with the black paint if I can find or make them...

 

One unexpected win is the frame bolt alignment. When it was in the container I was only able to fit 3 in one side and the remainder were off by a good bit so I had been stewing over how best to ream them out with some combination of a large bridge reamer and the mag drill. For whatever reason, I was able to get 7 of the 8 in and the last one is out by only a 16th or so and is the position with the most clearance. Washers are a bit of a mess and one of the nuts doesn't fit because of the frame geometry but all in all a pleasant scope reduction for a really annoying problem hiding behind the fact the original frame bolts are long since lost to time.  

 

That's it for now, but I'm making progress again finally! I have some pictures from Max's shop I'll post eventually that goes into the lineshaft setup I'll have to put in. While I was down there he hooked me up with a pair of shaft hangers and wheels for the motor-shaft and shaft-hammer belting. 

Unpacking.jpg

  • Like 3

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

Posted

 

Lots of steady progress getting everything put back together, thwarted by all the small issues I was not able to address before the exodus. Because I never had the chance to assemble anything during the restoration, several small geometry interference issues came up. Many of them happened because of paint drips into holes so there was a lot of running a knife, wire wheel, and reamer through what parts I could fit them into. Yoke bolt reduction.jpg

 

For the ones I made new, the measurements were taken off the old parts where possible but of course small tweaking became necessary. For the pair of cam eccentric bolts, I had to take a spring pass off the diameter and while I was at it I added a chamfer to where the shoulder starts just past the threads. 

 

Yoke bolt crosshole.jpg

 

I also never got around to drilling the cross hole for a retaining pin in the event the nuts begin to back off mid use. Nothing too challenging or interesting, but a major contributor to looking at the pile of hardware for quite some time trying to figure out what these were for. 

 

Flywheel hoist.jpg

 

With the cam mechanism sorted I was able to get the last bits of the cam-helve tie rod assembled and it was on to the rest of the drive shaft. Getting the flywheel into position made me wonder how I got it off in the first place. Even honing the inside of the bore, filing down any mushrooming of the shaft end, and liberal lubrication it was a serious challenge to get the wheel back on.

 

Frame Jack seat.jpg

 

To seat it I had to use this bottle jack handle press I made plus the sow block extraction frame to push on the shaft while holding against the flywheel. Before the handle press frame began to bend under the force, I managed to get about half way through the bore.

 

Frame Jack.jpg

 

Shortening the gap I was then able to just barely get this chain setup attached using the old helve bell damper top plate (because the original part failed and needed compression from the top instead of bolts from the flange) plus the lifting eye bolts from the hammer base. This combination ended up working and when the flywheel finally cleared the end of the shaft it slid freely much to my surprise.

 

Slide hammer keyway.jpg

 

One mystery solved, or at least resolved since I first dealt with this key, is the threading in the end that allows it to be attached to a slide hammer. In this case a bolt, some washers, and the upsetting block I made to make hardy tooling. I had to hone the key stock a bit to get it to fit due to the old galling on the keyway and reluctance to force it in beyond the strength of the little threads to remove again. It took a few trips to the grinder to sneak up on the fit but in the end it was a light interference fit for the final half inch or so.

 

Spring rod.jpg

 

The next bit I knew I would need to deal with and was not particularly excited that the time came. The guide rods that pass through the helve assembly cushions I remade from stainless due to the contact with the rubber and moisture problems causing the old ones to rust into oblivion. I left them long when I made them because I needed to do a rough assembly to get the length. So I cut them down to size and then it was onto threading the ends. Without access to a lathe which can single point cut the threads I need, I had to use a die which at full diameter would utterly destroy both the die and mangle the bars because of how tight they would need to be held to not slip. 

 

Spring rod threading.jpg

 

In the lathe I turned down about 30% of the engagement diameter so I could cut them. A set of progressive dies would be nice to have but perfect is ever the enemy of done. For what these need to do, it's also fully unnecessary to have the full strength of the threads. 

 

Stainless spring plates.jpg

 

The final bit of stainless work was to bore holes in the bottom plates that sit under the helve assembly cushions. As with the guide rods, the originals were totally destroyed from the moisture issues of the rubber contact. Although it will not be sitting outside in the rain for another 40 years, it was still an easy thing to do for future longevity. I was dreading this a bit, again no longer having access to tooling which would have made it trivial. The 150T hydraulic punch would do this in about 1 second for the pair, but I was reduced to drilling. A series of pilot holes then finishing it about 1/16" oversized to account for error transferring the hole location left the fit about perfect. The old 1904 drill press was perfect for the low speed, high pressure, large diameter drilling that I could not do with the mag drill due to the non-magnetic alloy.

 

Rubber spring pads.jpg

 

With all that done, I could return to assembly of the helve apparatus. I will likely still need to cast proper rubber cylinders for this but to see if the speculative geometry is correct, I am using a stack of this rubber matting cut from the excess base plate dampening mat. Due to the fact the hammer sat for so long idle, the old cushions were unreliable to take measurements from. The bottom ones were heavily deformed from holding weight for so long, and the top ones were sacrificed to get the hammer apart. This way, I can adjust where the helve assembly sits relative to the height of the eccentric throw then go back and cast proper single pieces rubber cylinders to the right heights.

 

Helve saddle hoist.jpg

 

Hoisting the first piece into place was the easiest of the lot because it did not have to align with anything other than the stainless guide rods. Rigged from the ceiling I had just enough reach to use this old pulley from 1896. It's kind of fun to be able to use equipment of roughly the same vintage as the machine they are helping restore.

 

Helve tongue hoist.jpg

 

Through a combination of ropes, ratchets, winches, and chain hoists, I managed to get the yoke tie rod attached to the helve assembly and through maddening amounts of micro adjustment get the pivot axle into all three pieces. 

 

Helve bell reassembly.jpg

 

Fitting the bottom bell housing was tricky because of the weight but once I could slip one bolt through the rest was easy. I need to make longer bolts/studs for this as I cut a second retaining plate and replaced the original so that the entire assembly is held under compression instead of tension. The one in the above picture has the repair, the bell machined down to remove the presumably broken flange, then threaded and matched with a steel plate with the same threads and mounting hole pattern. The plate sits on the very bottom and presses down on the crown of the bell so the threaded repair does not take the violent load. Because I had the chance, I cut a second one so it will be symmetric again but also hopefully mitigate the chance of the second one also breaking. Given what had to be done to repair the lower bell, I have no desire to go through that. 

 

New pad flycutting.jpg

 

Somehow along the way, either I miscounted or misplaced about 1/4 of the rubber disks for the helve assembly cushion stack. Luckily I have a fair bit of the matting leftover and an old flycutting drill that goes out far enough to reach the diameter. I thought about trying to use the more modern drill press but the idea of cutting rubber at high speeds scared me into using the mechanical drill once again. An added bonus is that I was able to run it forwards to pilot the hole, then reverse to cut the disk out without doing anything other than spinning the handle the opposite direction. The cutter in the drill was ground to leave a straight sided hole for the outside diameter of the cut but because I need the inside diameter I turned the bit around, thus requiring the quill to spin backwards for it to cut properly. Each one took about 5min including the setup time but there were 14 (plus an extra just in case) so it added up. Also a fun surprise was that this bit of matting was a different thickness for some reason but the final stack height came out to about perfect in the end.

 

New pad coring.jpg

 

After all the disks were cut, I still needed to core out the centre where the rod passes through. The smallest hole saw I have was a little over sized but it should not matter much.

 

Final nut uncoupling.jpg

 

Before the final helve cushion assembly, I needed to extract this bit of the original guide rod from the nut. Through a combination of drilling, heating, cold chisels, die grinding, and running a tap through it, the thing finally broke free a few hours later.

 

Helve rubber spring compression.jpg

 

Getting this assembly together was the moment of truth for some working theories on why it was built this way. There is an extra piece someone added along the way that spans between the two guide rods and I assume acted as a hoisting point. But the whole guide rod assembly and the way it interacts with the frame, the stainless plates on the bottom of the stack, and the upper frame blocks allows the assembly to be both built in place as well as lifted out once the upper horizontal bolts are removed. By using the thick upper frame plates (without bolts installed) as a compression surface via the guide rod, it allows a slight bit of pre tension on the rubber disk springs in addition to compressing the stack enough to install those horizontal bolts. Once bolted together, the tension via guide rod is backed off so the frame is taking all the load but still prevents the rubber from being pinched and ejected from the housing through use. It was very satisfying to finally get that worked out and validated.

 

Next up is figuring out the helve beam, forging a new key for the upper die (and maybe lower die because the one I already made ended up a bit small), and perhaps most formidable of the remaining tasks is fabricating a new drive wheel for the eccentric shaft. For now, it's looking like a power hammer again and so close to operational I can't help but occasionally spin the flywheel to see the eccentric/helve linkage operate.

  • Like 2

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

Posted

After putting my fine woodworking skills to the test, the helve beam is finally done! This was one of the more daunting pieces to make due to the complexity and lack of any suitable references. The original halves of the helve beam are in rough shape, the bottom being rotted mostly away and the top, while in better condition, was at some point cut short of where it interacts with the ram. Because of this, I did not have any sort of template to work off of other than the back end nor do I know how it is supposed to fit with the ram in terms of pivot point, tolerance, and if there is any sort of auxiliary bearing material between the wood and the iron. From what I have been able to find, on similar vintage helve hammers sometimes a bit of flat belting or compressed leather covers the end of the beam but that's about as good an answer as I can find. 

 

Based on Bradley hammers, (although the one original to me was a single piece construction) the helve should be made of vertically laminated hard maple. From an old Bradley catalogue, it specifies Rock Maple as the lamination but I could only find eastern hard maple so who knows if that is sufficient. I also picked up enough white oak to make a second pair of beams just in case because the lumber supplier is about 2hr away and I would rather not have to go back just for that. 

 

Test helve.jpg

 

To test the geometry I made a template pair of beams out of a random 4x4 planed down to fit and slowly worked away at the material until I had a tight fit around the iron helve pivot. This alone took the better part of a day to get right and even still you can see the ram end angle is not correct. Fitting these into the hammer was unexpectedly complicated as the beam is a wedge shape and with the rounded notch near the middle that drops down over the helve pivot, it is not as simple as just sliding it in. For the test, it is half width so I could use a scissoring motion to slide them past one another but that will not work for the full assembly.

 

Helve pattern transfer.jpg

 

My original plan was to use two 1.75" wide sections in the middle and an outer cladding of .75" boards for a total of 4 layers. But I had just enough width to get two sections out of the thicker boards so it ended up being 3 of the wider pieces. At the lumberyard, I picked through about 2,000lbs of wood to get the clearest boards with the tightest, straightest grain possible to minimize my chances of catastrophic delamination. 

 

Helve lamination staves.jpg

 

I do not have a bandsaw so cutting out all six of the lamination pieces tweaking them to each fit as an upper and lower pair took another couple of days spent carefully planing and rasping away at the geometry until I achieved good contact all around. 

 

Helve lamination.jpg

 

Based again on the Bradley construction as it has the best surviving documentation for the era, there are no mechanical fasteners in the helve lamination. I may end up putting a bolt through both ends where the force of the actuation is close to zero but for now I am leaving them out entirely.

 

Bronze washer sizing.jpg

 

Conveniently while the glue was curing for a day, the bronze arrived for all the washers. Due to the size of the hardware, it ended up being expensive but I cut it down by almost 50% by sizing everything down one gauge and opening the bore on the lathe to fit the pivots and bolts. Each washer needed only about 1/16" removed so there was still full contact area under the nuts and bolt heads. Fot the larger rear pivot axle that ties the eccentric to the helve assembly, I used sintered oil filled bronze. Probably completely unnecessary as all the movement happens on the inner linkage piece but they were also about $10 less a piece than the solid silicon bronze counterparts.

 

Bronze washer turning.jpg

 

As an aside, machining the silicon bronze was an unexpected delight. Compared to all the stainless and tool steel machining, it practically cut itself in spite of the rickety old lathe.

 

Bronze washers.jpg

 

Here's the biggest of the lot, plus another roughly 30 on the various ram guide studs, helve bell dampers, guide alignment bolts, etc.

 

Helve lamination glueup.jpg

 

With the glue dry, it was time to resquare the beam laminations and make them fit as a unit rather than 3 individual pairs.

 

Helve thicknessing.jpg

 

First off was trimming down about 1/8" from each side because the closest available stock left it a bit large. I decided to do it on the table saw rather than the planer to eliminate snipe. Of course, the blade did not quite reach high enough so I took down that last little bit with a block plane.

 

Helve test fit.jpg

 

Another day sneaking up on the fit (that gap closes when it's actually fastened down) and the beams are ready for the through holes. To get these to fit, I had to loosen the ram guides and slide the ram out as far as it would go on the studs. For the final length, I kept 2" on the outward side of the ram for no particular reason other than it was short enough to make the installation possible and long enough to feel deliberate. 

 

One at a time, I clamped the beams to the lower face of the iron helve pivot piece and used it as a guide for the angle. Nothing about the beams is square to the hole geometry so this was the only way I could guarantee it would match when the bolts needed to pass through all the pieces. As it was, I still needed to open the holes 1/32" to make the angles work. 

 

Helve hole boring.jpg

 

Due to the hole size, I resorted to a brace and bit. The hardness of the hard maple is no joke.  With the two holes augered out, I used this strange reamer to chamfer them slightly then reassembled to get the third hole located and drilled. All three holes are covered on top and bottom by some thick plates that act as the compression surface and prevent any splintering of the beam under load where the forces are greatest.

 

Helve finishing.jpg

 

Final bit for now was to scrape off all the paint and oil that made its way to the surface of the laminations and give them a healthy coating of boiled linseed oil. I'll go back a few more times over the next couple of days to refinish them so as to make them as resilient as possible to the filth they will be enduring for the next untold number of years. This process was a bit maddening to get through. The hours upon hours of subtle tweaking wore away at my sanity but in the end the fit was better than I could have hoped for. Both in the geometry of the interaction with the iron bits and the alignment of the holes. 

 

Next up: figuring out the drive wheel and getting the lineshaft operational! (or the easy way out and making up a key for the upper die)

 

John

  • Like 1

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

  • 2 weeks later...
Posted

Quick update while I work out more of the drive wheel-

 

Fitting the helve beam for the permanent setup I deliberated for some time about the surface roughness of the metal tongue plate. The metal casting is not all that smooth even after cleanup and the imperfect squareness in relation to the pivot mean that the wood does not fit as tightly as I would like. Although the mating surfaces are as matched as I can possibly make them, I fear during use the force distribution will cause issues with the lamination. So, taking it back off I added thin leather as a sort of levelling shim.

 

Leather seat.jpg

 

At first I tried to use it only on the portion of the beams that mate with the tongue but it caused too much of a gap on the ram end. In the end the entire interior face of each beam got leather and had I known it would play out I would have used a single strip on each beam instead of one on the flat and one on the curved bit. It's not going anywhere but aesthetically I wish the seam was not visible (even if it is virtually unnoticeable...)

 

Leather helve seat installed.jpg

 

Reassembled the fit is nice and after a few days tightening the bolts it has settled into all the discrepancies of the power transmission side of the interface. Only slight issue is now the fit is almost too tight on the ram side but that will wear in over time. 

 

Keyway Grind.jpg

 

While I work through the drive wheel I also tackled the upper die/ram key. Fitting power hammer keys is not necessarily difficult but it is incredibly tedious and time consuming. The surface grinder is the final bit of equipment trapped in the container so I had to use the belt sander surface grinding attachment. In the past, I have only been able to use it on grinders in the vertical orientation which works considerably worse than when the grinder is flipped horizontal. Turns out it actually works quite well this way and for the ease of the setup I wish I would have done this for the lower die key. I may make a new one anyway because the fit is a bit too loose and has a shim at the moment...

 

Layout Blue.jpg

 

For the upper die key, I repurposed the old lower die key because I already had it and the taper was close. To start, I cleaned up the rough faces on the normal grinder platen then matched that taper on the surface grinding attachment. Using Dykem on the key, tapped it in, and then back out. Where the key contacts needs to be filed down until there is almost complete surface contact between key and die/ram. In the above picture, there is a very small section in the middle that wore off the layout fluid so that is the starting point.

 

Sine Plate.jpg

 

Between the upper and lower keys, the angle is not exactly the same although close. So to sneak up on the right size, I used the sine plate feature of the grinding attachment. This alone made the process easier than the actual surface grinder because I can very precisely adjust the angle. I do not have a machinist's sine plate so I could not do this the same way in the mill or surface grinder. 

 

Sine bars or sine plates are effectively a way to make triangles with a fixed hypotenuse. The distance between the two round pins is (in the machinist's world) as precise as possible and varies between sizes of plates but a common distance is 6". This one is 6" between centres and the way it works is a taper angle is achieved by lifting the working surface from one of the two pins. I do not have a gauge block set so the next best thing is spacing the offset with drill bits. This gives me 1/64" increments which is a bit coarse but ended up working out fine. The process involved taking off the minimum amount to clear the whole key face, test the fit, and reassess. The angle started too shallow so I increased the distance offset on the sine plate and reground, tested, etc.

 

Once the angle was correct based on the wear pattern of the layout fluid leaving a wider swath of rubbed off bluing, it was time to figure out the dialled in fitment. 

 

It was at this point I remembered that there was a fair bit of damage to the face of the ram that I forgot about. As a result, even perfect mating with the key would only be about half the total available contact area. The only option was to take the ram off and go a bit backwards in the repair.

 

Nickel Welding.jpg

 

I filled in a series of deep scores marked the one lower corner and a few others on the middle of the face with high nickel stick welding electrodes. A few weeks ago I did a cast iron repair on my post drill and it worked so well I severely regret not figuring out the process for the tig brazing I did on a few non critical spots on the hammer. The way the nickel fuses with the cast iron was strong, did not have the porosity issues I've had trying other methods, and allegedly can (situationally) be done without a preheat meaning it is suitable for being done to equipment in place/without disassembly. 

 

Dovetale Rebuild.jpg

 

It took a few passes of welding and grinding/filing to get a clean face. Checking with a straight edge, it revealed what I already suspected in that the middle of the ram keyway face had some crown to it. While I was in there dealing with the welding I resurfaced it with careful grinding and a few hours of filing. 

 

Key Fit Layout Transfer.jpg

 

Retesting the key fit with the die while the ram was out of the hammer the contact was already significantly better and I felt comfortable getting the ram back in the hammer for the rest of the key work.

 

Ram Uninstallation.jpg

 

Due to the helve being installed the best way I had to manipulate the ram was to unbolt the ram guides and slide the pair of guides along with the ram out on a makeshift table. To be honest I should have done this setup to get it in the first time in that it was much easier to lift and move into place. 

 

The rest of the process was another day or so of careful tweaking, grinding, and checking the surfaces until the key sat at a good depth and showed about 90% contact over the area on both sides. Given this is the dynamic die it's more important to get the fit right compared to say the sow block key.

 

These little details I have left on the list are not extraordinarily numerous but they happen to be proportionally time consuming so progress feels slow. But progress is progress!

  • Like 1

Not all those who wander are lost. -J.R.R. Tolkien

-Shards of the Dark Age- my blog
-Nine Worlds Workshop-

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...